Upgrading Alberta’s roads, growing the economy

An 820-tonne piece of heavy equipment, called a splitter, left Edmonton on Jan. 6 for its destination in the Industrial Heartland, where it is scheduled to arrive on Jan. 9.

An 820-tonne piece of heavy equipment, called a splitter, left Edmonton on January 6 for its destination in the Industrial Heartland, where it arrived on January 9. — Photo courtesy Goverment of Alberta

A new government study identifies the improvements needed to Alberta’s existing High Load Corridor over the next two decades to give industry a more efficient way to move large loads, like construction and oil rig equipment.

The High Load Corridor is a series of designated routes connecting areas across the province that can accommodate loads of up to 12.8 metres (42 feet) in height.

An enhanced High Load Corridor will mean improved infrastructure required for large loads, such as the 820-tonne petrochemical piece of equipment that was moved from Edmonton to the Industrial Heartland January 6-9.

“A strong transportation network and an effective High Load Corridor are critical to Alberta’s economic, social and environmental strength and diversity. I’m confident this strategy will help pave the way for long-term, sustainable economic growth and jobs in Alberta. Now, more than ever, this is critical for our province.” — Brian Mason, Minister of Transportation

“Infrastructure improvements targeted to industrial development enhance access to markets for Alberta’s resources which, in turn, plays a role in attracting investment to Alberta. The more Alberta can do in this area, the better.” — David Chappell, chair, Resource Diversification Council

Upgrading the corridor will also reduce transportation costs for shippers, improve safety and lower emissions. Proposed improvements include bridge strengthening, pavement widening, staging and rest areas and other work that would significantly improve Alberta’s overall transportation network.

The Vinca Bridge, the recently announced projects on Highway 40, and the interchange at Highway 43X are all critical parts of Alberta’s High Load Corridor.

Quick facts

  • Alberta’s High Load Corridor has evolved over three decades.
  • About 150,000 oversized/overweight permits are issued annually in Alberta.
  • Budget 2018 includes roughly $255 million for upgrades to the existing corridor, including the Vinca Bridge.
  • The High Load Corridor study recommends about $1.6 billion of investment in the corridor over two decades.
  • Proposed enhancements could expand the corridor from the current 6,500 kilometres to nearly 10,000 kilometres.

Related articles

Close up of lithium being poured from one gloved hand to another.
Energy, Mines, Technology, Alberta New tech aims to extract lithium from oilfield waste

The demand for lithium, used for electric car batteries, is growing exponentially. New green technology could help extract the mineral from oilfield waste

by Julie Matchett
Chief Russell Myers Ross, vice-chair of the Tsilhqot'in National Government, stands in front of the Nation's new solar farm.
Energy, First Nations, British Columbia New solar farm completed by Tŝilhqot’in Nation expected to generate $175,000 in revenue

The 1.25-MW facility, located near Williams Lake, is the largest of its kind in British Columbia

by Julie Matchett
Nerva Energy's Joshua Lewis accepting his International Energy Innovator of the Year award.
Energy, Global International Energy Innovator of the Year awarded to Canada’s Joshua Lewis of Nerva Energy

The Association of Energy Engineers (AEE) is the leading international awards organization honouring excellence in engineering management and projects

View all articles