Project

Ladner

Talisker Resources Ltd. (TSK, TSX)

Resource estimate

Study
MRE
Category
Measured & Indicated | Inferred
Tonnes
0.72 Mt Measured & Indicated; 11.23 Mt Inferred
Grade
8.91 g/t Au (M&I); 8.73 g/t Au (Inferred)
Contained metal
206,300 oz Au (M&I); 3,151,000 oz Au (Inferred)

Drill highlights

UB-2026-024 85 g/t Au over 0.5 m
SB-2026-016 72.6 g/t Au over 0.5 m
SB-2026-009 48.1 g/t Au over 0.57 m
UB-2026-021A 44.8 g/t Au over 0.7 m
UB-2026-021A 25.2 g/t Au over 0.6 m
SB-2026-009 19.8 g/t Au over 0.5 m