Project
production
Cosalá Complex
Americas Gold and Silver Corporation (USA, TSX)
silver · Mexico
Drill highlights
Assayed by ALS Chemex de Mexico / ALS Vancouver
SR559 116.6 g/t Ag over 12 m
SR561 183.5 g/t Ag over 18 m
SR561 109.5 g/t Ag over 18 m
SR565 192.8 g/t Ag over 8.4 m
SR566 509.7 g/t Ag over 10 m
SR567 183.6 g/t Ag over 9.3 m