Project
development
Atlanta Gold Mine
Nevada King Gold Corp. (NKG, TSXV)
gold · southeast Nevada
Resource estimate
- Study
- technical report
- Category
- Measured & Indicated | Inferred
- Tonnes
- 27.7M (measured and indicated); 3.6M (inferred)
- Grade
- 1.14 g/t (measured and indicated); 0.84 g/t (inferred)
- Contained metal
- 1,020koz Au (measured and indicated); 99koz Au (inferred)
Drill highlights
AT26SP-61 0.3 g/t Au over 39.6 m
AT26SP-61 0.62 g/t Au over 13.7 m
AT26SP-62 0.14 g/t Au over 158.5 m
AT26SP-62 0.37 g/t Au over 16.8 m
AT26SP-62 0.58 g/t Au over 6.1 m
Releases mentioning this project
Nevada King to Effect Share Consolidation
Corporate · May 5, 2026
Nevada King Doubles Phase 4 Drill Program to 40,000 Metres, Provides Assay Results from Silver Park, and a Project Wide Permitting Update
Drill Results · Apr 28, 2026
Nevada King Closes $16.3 Million Financing Including a $10.4M Strategic Investment By Centerra Gold Inc.
Financing · Apr 10, 2026
Nevada King Announces $16 Million Financing Including a $10M Strategic Investment by Centerra Gold Inc.
Financing · Mar 24, 2026
Nevada King Expands Silver Park East Mineralization With 350m Step-Out, Intercepts 0.93 g/t AuEq Over 14.6m Starting at Surface
Drill Results · Feb 3, 2026
Nevada King Reviews 2025 Achievements and 2026 Exploration Strategy
Resource & Studies · Dec 29, 2025
Nevada King Announces Fully Funded 20,000m, Phase 4 Exploration Program Designed to Advance Multiple Regional Targets Identified in Phase 3
Production & Operations · Dec 11, 2025
Nevada King Extends Mineralization 150m Along Strike at Silver Park East
Drill Results · Nov 10, 2025