Klondike Gold Reports Phase 1 Drill Results Including 5.20 g/t Au over 3 metres
Klondike Gold Corp (the “Company”) is pleased to announce assay results from its 2025 Phase 1 diamond drill program, totaling 2,354.70 metres across 13 holes. The program was designed to test the orientation of major structural features interpreted to control gold deposition at the Company’s 100% owned Klondike District Property (the “Property”) in the Dawson mining district, Yukon, Canada. (See Figure 1).
Source
Read the original release