News

MONARCA MINERALS REPORTS COMPLETION OF PHASE 1 EXPLORATION DRILLING AT SAN JOSE PROJECT AND PRELIMINARY RESULTS INCLUDING 4.07 G/T AU OVER 3.0M

·

TORONTO, Ontario, November 9, 2021 — Monarca Minerals, Inc. (“Monarca” or the “Company”) (TSX-V:MMN) is pleased to announce that it has completed its Phase 1 San Jose exploration RC drilling program with 4,640.6m completed in 15 drill holes. Assay results from 7 of these drill holes are shown below in Table 1 and indicate significant […]

TORONTO, Ontario, November 9, 2021 — Monarca Minerals, Inc. (“Monarca” or the “Company”) (TSX-V:MMN) is pleased to announce that it has completed its Phase 1 San Jose exploration RC drilling program with 4,640.6m completed in 15 drill holes. Assay results from 7 of these drill holes are shown below in Table 1 and indicate significant Au, Ag, Cu, Pb and Zn mineralization, with the remaining assay results still pending from the laboratory. Read the full press release here

Aggregated Content

This article was imported from an RSS feed. Content and accuracy are the responsibility of the original publisher.