Nevada Lithium files Technical Report for Bonnie Claire Project. Significantly Increases the Size and Grade of Lower Zone Inferred Lithium Mineral Resources, and Reports Maiden Lithium and Boron Indicated Resources.
Vancouver, British Columbia – December 16,2024 – Nevada Lithium Resources Inc. (CSE: NVLH; OTCQB: NVLHF; FSE: 87K) (“Nevada Lithium” or the “Company”) is pleased to announce that it has filed on SEDAR+ an independent technical report entitled “Mineral Resource Estimate NI 43-101 Technical Report, Bonnie Claire Lithium Project, Nye County, Nevada” dated December 16, 2024, with an effective date of September 24, 2024 (the “Technical Report”). The Technical Report was prepared by Global Resource Engineering Ltd. The Technical Report was prepared at the request of the Company. The purpose of this Technical Report is to provide updated disclosure on the Company’s Bonnie Claire lithium project located in Nye County, Nevada (the “Project”) in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Nevada Lithium’s CEO, Stephen Rentschler, comments: “We are excited to announce the impact of the new drilling in the Lower Zone of mineralized Lithium and Boron at Bonnie Claire. With the significantly increased tonnage and higher grades, Bonnie Claire is potentially unrivaled by other sediment hosted Lithium projects in Nevada and is amongst the largest and the highest-grade Lithium resources in the world. We have significantly Increased the size and grade of Lower […]
Content Aggregated from External Source
This article was automatically imported from an RSS feed. The content and accuracy are the responsibility of the original publisher.