News
Initial Drilling to Assess Potential for Open Pit Production Intersects High-Grade Gold in the Jubilee Shear
•
5 views
Initial near-surface drilling intersects wide zone of alteration containing 14.51 g/t Au over 4.81 m including 90.40 g/t Au over 0.67 m The post Initial Drilling to Assess Potential for Open Pit Production Intersects High-Grade Gold in the Jubilee Shear appeared first on Red Pine Exploration.
Content Aggregated from External Source
This article was automatically imported from an RSS feed. The content and accuracy are the responsibility of the original publisher.